Crew spraying coating across a ribbed commercial metal roof in Bloomington, IN
Our Services

Metal Roof Coating Services in Bloomington

Five Coating Systems for Steel, Low-Slope, and Shingle Roofs

Our metal roof coating services in Bloomington cover five systems, each matched to the roof slope, condition, and building use we find on inspection.

  • Five Coating Systems
  • Matched After Inspection
  • Thickness Checked
Coating Systems

Choosing Metal Roof Coating Services in Bloomington

Each of our metal roof coating services in Bloomington starts with the same inspection. The cards show the order of work for each system.

Roofer cleaning and priming rusted metal panel seams before coating in Bloomington, IN

Commercial Metal Roof Coating

For plants, mill buildings, and shops with exposed screws, this system resets every fastener, primes rust, and reinforces laps before the field coat. It fits most of the steel roofs we see around Bloomington.

Order Of Work
  1. 1Reset Screws
  2. 2Prime Rust
  3. 3Fabric At Laps
  4. 4Field Coat
See Commercial Metal Roof Coating
Roofer spraying silicone coating on a low-slope commercial roof in Bloomington, IN

Silicone Roof Coating

Built for low-slope roofs that pond, silicone goes on thick over reinforced seams and stays watertight under standing water. It also goes over built-up and single-ply roofs that are dry underneath.

Order Of Work
  1. 1Dry The Roof
  2. 2Wash
  3. 3Seam Fabric
  4. 4Thick Pass
See Silicone Roof Coating
Roofer rolling acrylic coating onto metal roof panels in Bloomington, IN

Acrylic Roof Coating

Two contrasting coats of water-based acrylic suit steep metal that drains within hours and needs a bright, reflective finish. Work runs on dry, mild days between spring and fall.

Order Of Work
  1. 1Clean Steel
  2. 2Primer
  3. 3First Color
  4. 4Second Color
See Acrylic Roof Coating
Roofer spraying foam onto a commercial roof from a spray rig in Bloomington, IN

Spray Foam Roofing

Spray foam adds insulation and seals crowded penetrations, then gets a silicone or acrylic topcoat against sunlight. It can also be built up at low spots to push water toward drains.

Order Of Work
  1. 1Core Samples
  2. 2Cover Intakes
  3. 3Foam Passes
  4. 4Topcoat
See Spray Foam Roofing
Roofer coating asphalt shingles on a commercial building in Bloomington, IN

Shingle Roof Coating

Asphalt shingle sections that still lie flat get a shingle-rated coating after tabs and flashings are repaired. Curled or brittle shingles get a straight reshingle recommendation instead.

Order Of Work
  1. 1Check Tabs
  2. 2Flashing Repair
  3. 3Gentle Wash
  4. 4Shingle Coat
See Shingle Roof Coating
System Fit

Which System Fits Which Roof

Slope, standing water, and insulation needs point to one system over another. Use the rows below to see where your roof starts, then the inspection confirms it.

Which Metal Roof Coating Service Fits My Building

SystemRoof SlopeStanding WaterAdds InsulationRecoat Later With
Commercial Metal Roof CoatingLow to steep metalShort-lived puddles onlyNoThe same system
Silicone Roof CoatingFlat to low slopeTolerates ponding for daysNoSilicone only
Acrylic Roof CoatingSloped metal that drainsNeeds fast drainageNoAcrylic or other coatings
Spray Foam RoofingFlat to low slopeFoam can be sloped to drainsYes, across the roofSilicone or acrylic topcoat
Shingle Roof CoatingSteep shingle sectionsSheds water quicklyNoShingle-rated coating

Unsure Which System Your Roof Needs?

One roof walk answers it. Call us, describe the roof and any leaks, and we will set a time to look at it with you.

Call Us
How The Work Runs

How Every Bloomington Coating Job Starts and Ends

The steps stay the same across all five systems; the products, the thickness, and the drying time between coats are what change.

  1. 1

    Inspect Your Roof

    Panels, seams, curbs, and drains are checked on foot, and moisture readings show whether the insulation under the roof is dry. Every problem is marked on a roof plan with photos you keep.

  2. 2

    Match The System

    We pick the system that fits the slope, ponding, insulation needs, and how the building is used, and explain the choice in writing so you can compare it with any other quote.

  3. 3

    Repair And Prepare

    Screws, laps, flashings, and wet insulation are fixed first. The roof is then washed, and bare or rusted steel is primed before any coating or foam goes on.

  4. 4

    Apply And Measure

    Coats or foam go on to the specified thickness. Wet-film gauges and foam probes are used as the work moves, and thin spots get more material before the crew moves on.

  5. 5

    Walk It Together

    You walk the finished roof with us and keep a record of the products, thicknesses, and repairs, which makes later inspections and recoats easier to plan.

Roofer walking a commercial metal roof with the building owner in Bloomington, IN
Owner Questions

Questions on Picking a Coating System

Quick answers on choosing between the five systems, from cost and prep to what happens when a roof is past coating.

Which metal roof coating service fits my building?

The roof decides it

Slope, standing water, rust, and insulation decide it. Sloped steel takes the metal system or acrylic, flat areas take silicone, roofs short on insulation take foam, and shingle sections take a shingle-rated coating. The inspection settles which one applies to your building.

Can two systems go on one building?

Yes, by roof area

Many Bloomington properties have a sloped metal roof and a flat addition. Each area gets the system that fits it, and the edges where they meet are sealed so the two coatings overlap cleanly and shed water together.

Do all systems need the same prep?

Mostly, with differences

Every system needs a clean, dry roof with leaks fixed first. Metal needs rust primer, low-slope roofs need wet insulation replaced, foam needs a dry substrate, and shingles need loose tabs sealed down before anything goes on.

Which system costs least?

Acrylic, on the right roof

Acrylic costs less per gallon, which helps on large sloped roofs that drain well. All coating work falls in our range of about $2.50 to $4.00 per square foot, set after an inspection of your roof.

How long does each system take to apply?

Days per section

Most coating jobs run a few days per section, set by roof size, repairs, and weather. Acrylic needs drying time between coats, foam needs calm, dry days, and silicone can often go on in one heavy pass.

Do you coat roofs other than metal?

Yes, low-slope and shingle

Silicone goes over built-up and single-ply roofs as well as low-slope metal, spray foam goes over most dry roof types, and shingle sections get a shingle-rated coating. The common thread is a commercial roof that is dry and solid enough to keep.

What happens if the inspection finds a roof that should be replaced?

We say so plainly

Some roofs are past coating, with panels rusted through or insulation soaked across most of the area. In that case we explain what we found, show the photos and readings, and tell you that new panels or a new roof is the better spend.

How do I prepare the building for coating work?

Clear access and a contact

We need a place to stage a lift and materials, access to the roof hatch or ladder, and one contact for questions during the work. Rooftop equipment schedules and any intake fans near the roof are worked out with you before spraying starts.

Book Metal Roof Coating Services in Bloomington

Tell us about your roof, the building, and where water shows up inside. We recommend a system after the inspection and price it in writing.

Call (930) 271-9894